EUROPE PARTS · WATER RECYCLING SYSTEMS
WRS 50
Water recycling system
A coordinated treatment circuit for a 50 m³/h hydraulic basis.
WRS 50 combines a 10 m³ reaction volume with lamella clarification, reagent preparation, storage and return pumping. The components are selected together to match the actual wash water and operating cycle.

Where WRS 50 fits.
Feed equalisation, flocculation and clarified-water return are coordinated with the washing plant. Sludge removal must keep pace with the separated solids. A low average water flow may still contain significant peaks, so buffer storage is part of the selection.
Reference configuration.
| Parameter | Reference configuration |
|---|---|
| Model | WRS 50 / WRS 50M |
| Hydraulic treatment limit | 50 m³/h |
| Useful reaction volume | 10 m³ |
| Lamella clarification | 1 lamella unit |
| Reagent preparation | Two IBC reagent storage positions, dosing and polymer preparation; selection after water tests |
| Storage | Separate raw-water, clarified-water and sludge circuits |
| Indicative area — separate tanks | 12 × 10 m |
| Indicative area — M layout | 12 × 8 m |
Planning areas are not transport dimensions. Operating flow is confirmed through settling tests, the solids balance and pump checks. High clay loads can require a lower throughput or a different configuration.
WRS 50 or WRS 50M?
WRS 50 · separate tanks
Tanks are positioned beside the treatment frame. The indicative planning area is 12 × 10 m. Pipe routing and service access determine the final arrangement.
WRS 50M · modular arrangement
The treatment equipment is positioned above the tank module. The indicative planning area is 12 × 8 m. The same hydraulic basis is retained in a more vertically organised layout.
A system built around the whole circuit.
Treatment & return
- Reaction and flocculation tank.
- Lamella clarification appropriate to the model.
- Polymer preparation and reagent dosing.
- Clarified-water storage and return pumping.
Operation & integration
- Raw-water collection and sludge management.
- Level monitoring and operating conditions.
- Pipe routes coordinated with the site.
- Cleaning and maintenance access.
The commercial proposal confirms the exact equipment, controls, civil works, assembly and connections included. Storage volumes and sludge-removal frequency depend on solids loading and operating hours.
Frequently asked questions
Is 50 m³/h guaranteed for every wash water?
This is the reference hydraulic limit. Admissible operating flow depends on solids concentration, clay characteristics, flocculation, pumping and sludge removal. Representative tests confirm selection.
What information is needed for a proposal?
Provide average and peak flow, working hours, representative water samples, material type, a site plan and the available route for sludge removal.
EUROPE PARTS · APPLICATION ENGINEERING
Build the right configuration for your site.
Tell us about your WRS 50 requirement, the material, operating flow and available space. Our team will prepare the equipment selection, layout and scope of supply.
EUROPE PARTS · DALMAN INTERMEDIERE SRL · Bucharest, Romania
